Medway Route 109 Businesses May Use Temporary Signs during Construction

Issue Date: 
June, 2017
Article Body: 

The Town of Medway, in recognizing that businesses along Route 109 are facing challenges dealing with the impacts of the Route 109 Reconstruction Project, is receptive to allowing limited temporary business signs during the construction season through November. For more detailed specification on these temporary signs, visit the town website, www.townofmedway.org, go to the “Building Department,” and look for the Route 109 Construction Temporary Signs Policy and Application tabs on the left.